How the Studio Shed planning and design process works

How It Works

Planning, Design and Installation

Start with our 3D Design Center to create a design, then schedule a free consultation with a Studio Home advisor to plan your project. The Studio team will shepherd your project through permitting and fulfill your dream design in a matter of months.

Customer Configuration

[Save an initial design](/content/pages/design-center "Design Center"/index.html) to discuss on a phone/video consult with one of our advisors.

Site Visit

2+ Weeks

When installation is purchased, we initiate communication with a contractor within Studio Home's installation network. This contractor will come review your project on-site and with their input you will fill out an informational checklist. This document provides information necessary for the site work estimate and is required to inform Studio Home's permit plan set.

Customer Deliverables

Studio Home Deliverables

SH Network Contractor or DIY Contractor Deliverables
Site Visit Permitted Checklist

Answer Customer’s Pre-Construction Questions
Estimate for Scope Outside of Studio Home Kit

Order Placement & Deposit

1st Payment

Design Coordination

2+ Weeks

Studio Home's Design Coordinator prepares your site plan, floor plan, and elevations based on your configuration and the site visit. We share this Coordination Set with you for final approval then include them in the contract.

Studio Home Deliverables

Customer Deliverables

Approved Coordination Set & Contract

2nd Payment

Project Design

4+ Weeks

Studio Home's Project Designer works with our 3rd party Structural Engineer to prepare your unique Permit and Construction documents based on your configuration and local design criteria.

Customer Deliverables

Studio Home Deliverables

Permit Plan Set Delivered

3rd Payment

Permitting

4-12 Weeks

Your local building department’s plan review timeline can vary greatly. We often recommend engaging the planning department early on in the project to make sure there are not unforeseen hurdles in their process. Your Project Manager and Project Designer are available to address any comments or concerns from the building department after they review the plans.

Studio Home Deliverables

Customer Deliverables

Permit Issued

Final Payment

Scope Call & Production

2-4 Weeks

Studio Home's Project Manager (PM) approved plans (Coordination Set) based on your configuration and the site visit. The PM schedules a Scope call with designated installer and timeline to shipout and installation discussed.

Studio Home Deliverables

Customer Deliverables

Delivery

Scheduled with Customer

Installation

1-2 Weeks

Once the unit ships, you will have 30 days of free local storage to coordinate delivery to your site. If your site is ready for construction and you have coordinated with your contractor, installation can begin as soon as you receive delivery. Your Project Manager is your best resource to assist in answering install related questions as the unit is being built.

Customer Deliverables

Studio Home Deliverables

Studio Home Network Contractor or DIY Contractor Deliverables

Process at a glance

Frequently Asked Questions

Site Visit

When do I have to provide the completed Site Visit Checklist?

The Site Visit Checklist will need to be completed in order to progress into the Design Coordination phase. The information provided in the Checklist is required to efficiently work through your design and set your project up for success!

Design Coordination

Does my project need to comply with energy code?

Chances are, yes. Any building that uses heating or cooling (conditioned) needs to comply with energy code. Further, any building that is considered ‘habitable’ is required to be conditioned.

CALIFORNIA: Additional material or equipment upgrades may be required outside of Studio Shed kit. Solar panels are required for all new conditioned residential buildings in CA.

Do I need a survey?

Our permit plan set includes a general site plan based on GIS and Public data. Customer is responsible for verifying accuracy and providing a Survey or ILC if required by local jurisdiction.

Project Design

Do I need a soils report?

Building code allows us to make some assumptions, but ultimately the building official is allowed to request a soils report. If you are unsure, we recommend reaching out to the building department to determine if they’ll require one for your project.

If any foundations on your site are showing signs of settling, or if you’ve needed to provide them in past, we recommend pursuing a soils report for your Studio Shed.

Permitting

Does the plan set include permit fees?

No, Permit fees are the responsibility of the customer.

Scope Call & Production

How long does production take?

Current material lead times are the largest factor in the production timeline. We are generally able to build and ship units with just a few weeks of permit approval, but site work and special materials can occasionally cause delays.

Is this my only opportunity to ask questions during the project?

No, your Project Manager will be available all the way through completion of the unit to answer questions you or your contractor may have. Your Project Manager will also be your main point of contact if you have questions once the Studio Home is complete.

Can I get away with making alterations after permit approval?

It is unlikely, but feel free to ask your Project Manager. Most modifications will require another round of revisions with the city, additional design fees, and more time until you can build.

Is a scope call necessary?

While we do not require you to take the call, we highly recommend you do so we may cover the necessary items to make your project go smoothly.

Can I change my color choices after my Studio Home is in production?

No. Your color choices are locked in once you sign the Coordination Set and Contract. As each building is fabricated individually, last minute changes derail the production, shipping, and installation schedules.

Installation

Does my unit include HVAC?

Only if a Studio Home Bathroom Kit is purchased. Otherwise, this can be quoted by your contractor directly.

How is my building anchored to the foundation?

Depending on the foundation type (concrete or wood), you will use concrete anchor bolts or structural wood screws provided by Studio Home.

How long does installation take?

By building individual components in our factory, we are able drastically reduce on-site construction time as compared to typical construction. Installation timelines vary greatly by region and project scope, and a full ADU can take several weeks. Inspection timelines can also vary greatly by building department. Your timeline will be discussed more specifically in your scope call.

When does my foundation need to be completed?

Ideally, by the time your unit is being delivered your foundation should be fully built, cured, and evaluated for proper conditions (ie: square, level, at least 8” above grade). If inspections are required these should be completed prior to delivery as well.

Who is responsible for my inspections?

If DIY, you or your contractor should decide how these will be handled with the AHJ (authority having jurisdiction). If DIFM, your Studio Home Network Contractor will schedule and be present (if necessary) for all inspections.

What do I do if my shipment is damaged when it arrives?

Contact your Project Manager immediately. They will ask you to provide photos and description of the damages (photographs need to be of material still on the truck if it arrived damaged on the truck). Your PM will determine the best course of action for repairing or replacing the damaged materials. It is critical that you inspect the materials for damages as soon as possible to allow Studio Home to properly assess how to move forward and minimize construction delays.

What do I do if I need to store my building kit on site before it's installed?

Contact your Project Manager for guidance on how to properly store materials on-site. Please note that an unbuilt Studio Home kit is not designed to withstand the elements for long periods of time if not properly protected.